Chris Garrett

The purpose of this process memorandum is to explore the factual basis for these comments and determine if they warrant changes to the assumptions used in the DEIS analysis.

The purpose of this process memorandum is to provide the background and summary of the total direct and indirect emissions of greenhouse gases (GHG) associated with the proposed action for the Resolution Copper Mine (RCM) Development near Superior, Arizona.

A public comment was received suggesting that an alternative or supporting technique could be used to bolster the analysis of geomorphology in the FEIS. The purpose of this process memo is to document the response to this comment, in support of changes to the FEIS.

The purpose of this memorandum is to provide a summary of the process used for selecting the third-party contractor (SWCA Environmental Consultants [SWCA]), the contractual arrangements pertaining to SWCA, Resolution Copper Mining, LLC (Resolution Copper), and the Tonto National Forest, and details of how potential conflict of interest has been identified and managed.

The purpose of this memorandum is to summarize pertinent information gathered in response to these public statements.

The purpose of this memo is to provide detailed rationale for the determinations expressed regarding a document purported to be the technical analysis demonstrating the financial feasibility of cut-and-fill mining.

The purpose of this process memorandum is to detail the process steps undertaken during the alternatives development process, related to evaluation of alternative mining techniques.

The alternatives development process was last documented for the public in a Draft Final Alternatives Evaluation Report in November 2017. The purpose of this process memorandum is to document key process steps occurring since November 2017 that have resulted in a revised range of alternatives to be considered for detailed analysis in the DEIS.

The purpose of this process memorandum is to describe additional supporting resource information in detail. The Air Quality section of Chapter 3 of the EIS includes brief summaries of the information contained in this process memorandum.

The purpose of this process memorandum is to describe additional supporting resource information in detail. The Water Resources section of Chapter 3 of the EIS includes brief summaries of the information contained in this process memorandum.

Pages

Media Point of Contact

Susan Blake
susan.blake@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website