This memorandum describes updates to the proposed Inconceivables preliminary road routing (Inconceivables Road) described in the “Inconceivables Preliminary Road Routing” memorandum dated October 10, 2019.
This Conceptual Mitigation Plan introduces the suite of potential mitigation elements that Resolution will use to comply with the 2008 Mitigation Rule.
This memorandum has been prepared to document the extent of oridinary high water mark (OHWM), aquatic features (seeps and springs), and potential WOTUS for compartitive analysis between the five TSF alternative footprints.
The purpose of this memo is to present results of water balance analysis for each of the five tailings storage alternatives (Alternatives 2 through 6).
The purpose of this work was to identify the presence or potential presence of recognized environmental conditions (RECs) resulting from past or present activities.