Pilot Plant Test Work
Date Published:
December 19, 2014
Authors:
Rio Tinto is evaluating the Resolution Copper deposit located in Arizona. The main interest for this project is copper, with a secondary value in molybdenum. The principle objectives of this project were to:
- Construct a composite and assess the chemical and mineralogical characteristics of the sample.
- Conduct limited metallurgical laboratory test work to confirm the performance for two flowsheets, namely a bulk circuit and selective circuit.
- Prepare pilot plant feed material, and operate a pilot plant to evaluate continuous metallurgical performance of both flowsheets.
- Produce pilot plant bulk concentrates for subsequent copper-molybdenum separation testing.
- Produce pilot plant flotation products for testing by other vendors.
- Produce pilot plant products for environmental testing.
Cited In:
ALS (2014) Pilot Plant Test Work, Resolution Copper Project, Rio Tinto. Report KM4420, December 19, 2014.
*This PDF document is not Section 508 accessibility compliant. If you require accessibility assistance, please contact us to Request Assistance.
Media Point of Contact
Susan Blake
susan.blake@usda.gov
Apache Leap Special Management Area
Apache Leap SMA website