Documents Cited - General Plan of Operations
![]() |
Three-Point Approximations for Continuous Random Variables |
Keefer, D.I. and Bodily, S.E., 1983, Three-point approximations for continuous random variables: Management Science, v. 26, p. 595-609. ![]() |
![]() |
Low-Volume Roads Engineering Best Management Practices Field Guide |
Keller, G and Sherar, J. 2003. Low-Volume Roads Engineering Best Management Practices Field Guide. July 2003. ![]() |
![]() |
Tonto National Forest Land and Resource Management Plan: Management Indicator Species Status Report |
Klein, E., M. Gilbert, S. Lisius, R. Richards, M. Ross, C. Woods, B. Calamusso, D. Pollock, and J. Spencer. 2005. Tonto National Forest Land and Resource... ![]() |
![]() |
Resolution Project Tailings Characterization: Static Geochemistry |
Klohn Crippen Berger (KCB). 2007. Resolution Project Tailings Characterization: Static Geochemistry, Letter Report to Resolution Copper Mining,... ![]() |
![]() |
Resolution Project 2010 Geotechnical Testing of Tailings Samples |
Klohn Crippen Berger. 2011. Resolution Project 2010 Geotechnical Testing of Tailings Samples. January 12, 2011. ![]() |
![]() |
Resolution Copper Mining Near West Tailings Management Mine Plan of Operations Study |
Klohn Crippen Berger. 2014. Resolution Copper Mining Near West Tailings Management Mine Plan of Operations Study. September 2014. ![]() |