Victoria Peacey

Thumbnail image of Response to Alternatives Memo #5 - Concurrence on Revisions to Proposed Action and Range of Alternatives memo cover

Receipt notice for letter from TNF Supervisor dated March 8, 2018 and concurrence with approach to modify range of alternatives considered in detail in Draft EIS.

Thumbnail image of Follow-up Alternatives Information letter page

Resolution Copper is providing some additional information related to the nature and characteristics of underground hard rock mineral deposits and how the characteristics of the deposits define the mining methods that are used with a particular focus on selective methods such as cut and fill and unselective methods such as block caving as the two methods that have been used by mines in and around the Copper Triangle for the last century.

Thumbnail image of Response to Mitigation Comments - Part 4 - M-W16 email

Email communication as follow-up to submittal to include mitigation requiring water levels be maintained at current levels, and replacement of water lost in fractured Queen Creek bed by pumping water into Queen Creek above Magma Bridge.

Thumbnail image of Response to EIS Action Item EIS-262 email page

Response to EIS action item (EIS-262) to "Provide information on logistical concerns regarding train and filter plant"

Media Point of Contact

Amanda Oliver
amanda.oliver@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website