The purpose of this process memorandum is to describe the process by which the proposed project and alternatives were reviewed for consistency with the 1985 forest plan.
Materials that meet the criteria of Freedom of Information Act exemptions are not posted on this website. Culturally sensitive materials not posted here fall under this criteria.
The purpose of this process memorandum is to summarize the most recent water balances for all alternatives. These water balances replace those in the previous process memorandum.
The purpose of this process memorandum is to document the process used by the National Environmental Policy Act (NEPA) interdisciplinary (ID) team to identify and consider reasonably foreseeable future actions (RFFAs) for inclusion in the cumulative effects analysis of the Resolution Copper Project draft environmental impact statement (DEIS).
The purpose of this process memorandum is to provide consistent time frames for each of the three mine phases—(1) construction, (2) operations, and (3) closure and reclamation—and the overall mine life as described for the proposed action in the “General Plan of Operations” (GPO).
The purpose of this process memorandum is to provide a summary of the U.S. Department of Agriculture Forest Service review of publicly available documentation regarding Resolution Copper Mining, LLC’s (Resolution Copper’s) water rights information.
The purpose of this process memorandum is to provide a summary of the baseline hydrology, hydrogeology, hydrochemical, and geochemical data received from Resolution Copper Mining, LLC (Resolution Copper).
The purpose of this process memorandum is to describe additional supporting resource information in detail. The Scenic Resources section of Chapter 3 of the EIS includes brief summaries of the information contained in this process memorandum. This process memorandum covers the following topics: