Ed Peacock

This technical memorandum has been prepared to document results and analysis of a 23-day aquifer test conducted at hydrologic test well HRES-09. M&A conducted the long-term test to provide aquifer parameters for the Apache Leap Tuff (ALT) aquifer in the area of the well.

This technical memorandum was prepared to summarize results of drilling, construction, equipping, and testing at hydrologic test well DHRES-06. The well was installed to characterize hydrogeologic conditions in the deep groundwater system south of the South Boundary Fault and to provide a monitoring point for the deep groundwater system during dewatering of existing mine workings. Monitoring data obtained from DHRES-06 will be incorporated into the RCM hydrologic monitoring program.

Media Point of Contact

Susan Blake
susan.blake@usda.gov

Apache Leap Special Management Area
Apache Leap SMA website